Now things start looking good....
The cabinet install took two days.  "Lowers" on the first day and "uppers" on the second day.  We can't say enough about the workmanship and quality of these cabinets!!  And overall, the job has gone very well - - knock on wood (and we have plenty of it around here).
Here are the cabinets and another picture of them as they sit now with the floor installed and the fridge in the kitchen.  Next step is granite.
Granite should be in by Tuesday 11/28
It took me a couple days to get these pictures posted because there was a lot of work to do after the granite was installed.  The kitchen is all done now with the exception of the final electrical.  That will include the under cabinet lights, all the light switches and the oven.    Final pictures to follow.....
Here you can see the appliance garage and dishwasher...
Close up of the cooktop and the granite behind it.  I'm trying to get a real good picture of all the detail in this granite but so far I've been unsuccessful.
Page 3 - the last page..